Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

CC Road closed for sheet-pile work at Muntz Pump Station; residents asked not to dump in canals

5532912 · August 5, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Parish President Jewel said both lanes of CC Road in Muntz will be closed between U.S. 61 (Airline Highway) and River Road through Aug. 15 for sheet-pile installation at Muntz Pump Station No. 1 and urged residents not to put debris in drainage canals after crews hired divers to clear bar screens.

Parish President Jewel announced that both north- and southbound lanes of CC Road in Muntz will be closed between U.S. 61 (Airline Highway) and River Road through Friday, Aug. 15, at 10 p.m. for sheet-pile installation at Muntz Pump Station No. 1. The parish said the closure is necessary for construction safety and will be used while crews set sheet piles at the pump station.

The closure is one phase of a longer project that…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans