Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission approves engineering contracts for West Magnolia corridor and Ninth Street/Watewell roundabout design

5433573 · July 14, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission authorized the city manager to execute two engineering services agreements: WSP USA for West Magnolia phases 2 and 3 design ($506,772) and Kaw Valley Engineering for Ninth Street and Waterwell Road improvements including a roundabout ($420,425). Both contracts passed on 5–0 votes.

The Salina City Commission voted July 14 to authorize two separate engineering service contracts for roadway improvements.

Jim Kowach, the city engineer, outlined the West Magnolia corridor work and the associated design contract with WSP USA. The work continues a multi‑phase improvement of Magnolia Road west of I‑135 and includes a three‑lane typical section, roundabouts (Virginia Drive and Centennial) designed to accommodate truck turns, sidewalks, and a 10‑foot off‑road bicycle path on the south side. Kowach said the project will also incorporate a fourth leg requested by Kansas State University for…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans