Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Commercial Development topic
No spam. Unsubscribe anytime.
Planning commission approves Colonial Flag building design changes; owner seeks large flagpole
Summary
Commission approved revised elevations and reduced footprint for Colonial Flag’s new Rockwell Landing building; the owner requested consideration of a 150‑foot flagpole and discussed business plans and community partnerships.
Get email alerts on the Commercial Development topic
No spam. Unsubscribe anytime.
The Planning Commission approved an amendment to the conditional use permit for Colonial Flag’s new building in Rockwell Landing, accepting changes to the building façade and a modest reduction in footprint while carrying forward prior conditions. Sheldon, planning staff, summarized the proposal: the building design shifts from a concrete tilt‑up to brick/metal panel facades with a roughly 6,200 square‑foot reduction in footprint and minor site adjustments, including the removal of one loading dock. Sheldon said the project meets the manufacturing‑zone design standards and that engineering had no objections; staff recommended approval with conditions (one of the previously required conditions had already been met). Owner Paul Swenson described his company’s history and said the new building will include a retail showroom, expanded production space and public engagement features such as school tours; he also asked commissioners to consider allowing a very large flagpole — he mentioned 150 feet (or “155 feet”) — as a landmark feature. The planning staff and commissioners noted concerns about utilities and safety and said the requests would be evaluated through permitting and applicable codes. Commissioner Heather moved to approve item 4.2 with staff recommendations; Daryl seconded. The roll‑call vote was unanimous and the motion passed. Staff will require an updated photometric plan and concealed‑fastener metal panels for visual consistency, and will verify landscaping and parking islands per existing conditions from the original approval.

