Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Staff proposes raising finished-floor elevation to 3 feet above base flood elevation for new homes in floodplain

5403752 · July 16, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Planning staff proposed increasing the required finished floor elevation (FFE) for new structures in the county's floodplain from the federal minimum of 1 foot above base flood elevation to 3 feet, citing increased flooding frequency and regional precedent.

Planning staff proposed raising the required finished floor elevation (FFE) for new construction within the county's mapped AE (1% annual chance) flood zone from the federal minimum of 1 foot above base flood elevation to 3 feet. Staff said several nearby jurisdictions have adopted higher locally required elevational standards and argued the change would reduce flood damage risk for new construction.

Why this matters: staff said flood events have become more frequent in several local watersheds and…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans