Facilities staff reported AC and generator maintenance, UPS testing, planned generator installations, painting and other building work; committee discussed the Farmer’s Market parking lot condition and the possibility of moving repairs from 2027 into the 2026 budget.
Get email alerts on the Facilities Maintenance topic
No spam. Unsubscribe anytime.
Facilities staff reported multiple maintenance activities across county properties, including HVAC cleaning, stairwell emergency lighting, generator work and UPS testing, and said a new generator installation is scheduled for mid‑to‑late July with the project expected to finish in August.
Staff said they have been painting the basement floor, installing emergency lights, testing the MIS UPS (which held power for about 45 minutes during testing) and preparing for a scheduled shutdown to tie onto the switchgear. Facilities reported work at multiple sites, including Hillsdale solid‑waste meter pan replacements (moving from plywood to strut) and soffit vent replacements at highway buildings.
Staff also raised the Farmer’s Market parking lot, confirming county ownership and maintenance responsibility and noting the lot has many patched areas and potholes. The lot is on the facilities list for a full rebuild in 2027, but committee members said they would explore whether budget adjustments could advance the work to 2026 so repairs can be made before the market season. Staff said interim patches will continue while they evaluate scheduling and budget options.
Committee members briefly discussed the county wood boiler at the shop: staff said the existing unit burns through fuel quickly and is too small for needs, and that DEC rules limit upsizing; the county is evaluating options and noted earlier NYSERDA support for a smaller unit that proved inadequate.