This article was created by AI summarizing key points discussed. AI makes mistakes, so for full details and context, please refer to the
video of the full meeting.
Please report any errors so we can fix them.
Report an error »
The Finance and Personnel Committee received the 2024 Compliance Maintenance Annual Report (CMAR) for the Isle La Plume wastewater treatment facility and voted to accept the report unanimously on June 5.
Assistant Superintendent Brian Hine told the committee that a plant upgrade installing new headworks screening equipment required relocating the composite influent sampler to a point that records higher biochemical oxygen demand (BOD) and total suspended solids (TSS) than the previous location. Hine said the downstream primary sampler remained consistent and the screening equipment appears to remove a substantial portion of the loading captured by the relocated sampler, creating an artificially elevated reading in the CMAR.
Hine said staff expected the change and had discussed the issue with the DNR; a meeting with the basin engineer occurred the same day as the committee meeting. He told members the apparent deficiency in influent flow and loading is not reflective of the plant’s treatment performance and that staff are working with the DNR to resolve the reporting designation.
Committee members asked about maintenance ratings (the facility graded itself lower than some members expected) and the possibility of an energy-efficiency study. Staff said much of the equipment is newer from recent upgrades, that conditioning and optimization of systems remain ongoing, and that some energy and process reviews will await having all systems online and operational for a period of reliable data. Director Gallagher estimated some related energy/exchange steps with Xcel Energy could require an 18-month process and suggested 2026 as a target for certain energy initiatives.
Council members commended plant staff and noted high overall ratings in the CMAR; the committee unanimously approved the CMAR resolution (moved by Council member Newberry, seconded by Council member Northwood).
Staff said they would continue to work with the DNR on sampler designation and follow up on energy-efficiency opportunities as the upgraded systems run longer and provide more operational data.
View the Full Meeting & All Its Details
This article offers just a summary. Unlock complete video, transcripts, and insights as a Founder Member.
✓
Watch full, unedited meeting videos
✓
Search every word spoken in unlimited transcripts
✓
AI summaries & real-time alerts (all government levels)
Search every word spoken in city, county, state, and federal meetings. Receive real-time
civic alerts,
and access transcripts, exports, and saved lists—all in one place.
Gain exclusive insights
Get our premium newsletter with trusted coverage and actionable briefings tailored to
your community.
Shape the future
Help strengthen government accountability nationwide through your engagement and
feedback.
Risk-Free Guarantee
Try it for 30 days. Love it—or get a full refund, no questions asked.
Secure checkout. Private by design.
⚡ Only 8,057 of 10,000 founding memberships remaining
Explore Citizen Portal for free.
Read articles and experience transparency in action—no credit card
required.
Upgrade anytime. Your free account never expires.
What Members Are Saying
"Citizen Portal keeps me up to date on local decisions
without wading through hours of meetings."
— Sarah M., Founder
"It's like having a civic newsroom on demand."
— Jonathan D., Community Advocate
Secure checkout • Privacy-first • Refund within 30 days if not a fit