Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission continues hearing on failed septic replacement at 3 Bridge Street near Sudbury River

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission continued a Notice of Intent from an owner proposing a Presby elevated septic system at 3 Bridge Street with work in riverfront and bordering vegetated wetland areas; reviewers requested additional delineation verification, a certified abutters list and consideration of compensatory flood storage.

The Southborough Conservation Commission continued a public hearing for replacement of a failed septic system at 3 Bridge Street after staff and peer review raised questions about wetland flags, riverfront-area work and floodplain impacts.

David Schofield, the applicant’s representative, said the existing system is old and failing and that the proposed replacement is an elevated Presby system intended to reduce the leaching-field footprint and to maintain a gravity flow arrangement. “This site is on the corner of the lot... it abuts the Sudbury River,” Schofield said, and he described…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans