Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Committee tables Wausau Avenue reconstruction to examine multiuse path option, speed and turn‑lane tradeoffs

5367307 · July 11, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

After a lengthy public discussion and Bike & Ped Committee recommendation, the Infrastructure and Facilities Committee tabled a final design decision for South 50 Second (East Wausau Avenue) to allow staff and DOT consultants to draw alternatives including an off-street multiuse path, and to consider speed limit and turn‑lane placement.

The Infrastructure and Facilities Committee voted to table a decision on the South 50 Second (East Wausau Avenue/State Highway 52) reconstruction and bicycle/pedestrian accommodations so staff can present additional options and materials, including aerial overlays and possible multiuse trail alignments.

City and Bicycle & Pedestrian Committee staff presented competing recommendations. Bike & Ped recommended a 25 mph posted limit from Sixth to Eighteenth Street, an 8–10 foot multiuse trail on one or both sides of the roadway, 3–5 foot terraces with street trees, left-turn lanes only at high-priority intersections, and pedestrian refuge islands at key crossings. Staff and the DOT consultant had earlier recommended an on‑street two‑way left‑turn lane (center turn lane) with…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans