Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
TAG rejects mandated HVAC capacity check; proponents urged to refine proposal
5055231 · June 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.
Summary
A proposal requiring a field capacity check on ducted HVAC systems (O9) was disapproved by the TAG following discussion about test methods, climate applicability, sampling and the practicalities of applying a 10% tolerance.
Jonathan introduced proposal O9, a requirement to perform a capacity check on centrally ducted heating systems at installation time (a test referenced to the ANSI/RESNET/ICC commissioning standard task for measuring delivered capacity). The proposed test calculates delivered heat as CFM x 1.08 x measured —9Delta-T—9 (supply minus…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans

