Water Sector Commission's recommendations for $2.19 million in additional funding approved by JLCB

4545940 · June 20, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The JLCB approved three corrections/additional funding items from the Water Sector Commission totaling $2,194,066 for ongoing water projects that exceeded 5% of original grant awards.

The Joint Legislative Committee on the Budget approved the Water Sector Commission's recommendation to allocate an additional $2,194,066 in funding for three ongoing water projects after the commission met April 29.

Representative Zirane reported the commission approved "a total of $2,194,066 in additional water sector funding for 3 ongoing water projects," and moved to include all three items for a global vote. The items were described in a letter included in committee packets; Representative Zirane named the specific projects as Greenbrier Prairie Bass Water System, Point Chantilly Water System (referred to in the packet), and Southeast Waterworks District No. 2 and moved approval of the commission recommendations. Representative Raine moved the item on the committee floor and the motion carried with no opposition.

Because the supplemental amounts exceeded 5% of original grant awards, the commission required JLCB approval; the committee recorded no opposition to the approvals. Representative Zirane offered to answer questions and noted the funding corrections and additional allotments were documented in the meeting packet letters.