Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Site Plan Autozone topic

No spam. Unsubscribe anytime.

Planning Commission approves AutoZone tenant build‑out at Jackson Heights Plaza

3863257 · June 18, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Murfreesboro Planning Commission approved initial and final design and site‑plan review for an AutoZone tenant build‑out at Jackson Heights Plaza, including a raised battery‑testing sidewalk and a new dumpster enclosure; approval is subject to providing elevation details for the dumpster material match noted by staff.

The Murfreesboro Planning Commission on June 18 approved initial and final design and site‑plan review for a 24,301‑square‑foot AutoZone tenant build‑out at Jackson Heights Plaza, 810 NW Broad Street.

Staff said the application proposes no new utility or stormwater infrastructure and no façade changes to the existing shopping center; it includes a new painted‑brick dumpster enclosure and an elevated sidewalk and striped/bollarded area for routine battery testing and minor services. “The applicant is seeking an initial and final design review for the AutoZone store within Jackson Heights Plaza,” Planning staff member Mr. Donovan said during the presentation.

Commissioners and staff emphasized safe pedestrian circulation between the battery‑testing area and the shopping center and confirmed truck turning templates and a BZA condition limiting large‑truck access off Jones Boulevard. Staff noted one outstanding item: elevations showing the dumpster material match to the existing facade. Mr. Donovan said the applicant indicated the dumpster enclosure will use painted brick to match the plaza.

A motion to approve the site plan passed on a voice vote. Planning Commissioners who recorded “aye” during roll call included Mr. Carroll, Mr. Harris, Mr. Prince, Mr. Roy and Chair Jones. The motion was otherwise recorded as approved by the commission.

The approval allows the tenant build‑out to proceed with the requirement that staff receive the matching dumpster elevation drawings and that the BZA special‑use permit conditions (restricting on‑site repairs to the designated area) be honored. Staff will verify the final elevations before issuing permits.