Council awards subtransmission-line rebuild bid; low bid under engineering estimate

3672750 · June 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Aldridge City Council approved awarding the bid for the subtransmission-line rebuild project to a local firm after receiving three bids; staff said the low bid was about $2.45 million, below an engineering estimate of about $3.1 million.

The Aldridge City Council voted to award the bid for the 345 kV subtransmission-line rebuild project after staff opened three bids and recommended the lowest responsible bidder.

Jess Olsen, presenting, told the council the engineering estimate for the project was about $3.1 million and said the low bid from a local firm (IES) came in significantly lower. “We plan to bid for that 3451. We ended up with 3 bids,” Olsen said, adding that the low bid was below the estimate and appeared competitive.

Councilmembers asked no substantive follow-up questions during the presentation and moved to award the contract; the motion carried. Staff said they would proceed with contracting procedures and move to financing and scheduling steps.

At a later point in the meeting council discussion, staff said they will bring financing for the subtransmission-line upgrade to a future meeting and are working with a local bank to finalize rates and buy-downs before borrowing.

No construction activity was started at the meeting; the council’s vote authorized staff to proceed with award and contract execution consistent with procurement rules.