Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Wetlands Development topic

No spam. Unsubscribe anytime.

Board approves shed in wetland buffer if attached to house; requires revised plans and wetlands monumentation

3665639 · June 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The planning board granted a special-use permit for a small storage structure for property owners at 7 Fawnhaven Drive on the condition the 12x16 shed be attached to the primary dwelling and that the applicant submit a revised plan, wetland-monumentation stamps and construction notes.

Wolfeboro Planning Board members approved a special-use permit allowing a 12-by-16-foot storage structure to be constructed within the wetland buffer at 7 Fawnhaven Drive, provided the structure is attached to the existing house and that the applicant submit revised plans and certified wetland monumentation before a building permit is issued.

Peter Cooperdock presented the application for Denise and Paul Fleischner, explaining the property had received a previous special-use approval for the main house in 2017. The proposed shed would sit on a pervious stone pad with limited clearing and would be at least five feet from the existing building; board members noted town zoning calls for a 20-foot separation between freestanding buildings but said attaching the structure to the house would reduce buffer impact and fall within the board’s discretion.

Conditions: The board required the applicant to revise the plans to show the shed attached to the house, to include certified-wetland-scientist and licensed land surveyor stamps on final filings, to submit two sets of final drawings in the sizes requested by staff, to install wetlands boundary monuments at 50-foot intervals and to submit a letter certifying monument placement prior to permit issuance. The board also limited the special-use permit’s validity to one year unless construction begins.

Why it matters: The decision preserves a small amount of wetland buffer while giving the homeowner a modest enclosed storage area. The attachment requirement reduces new impervious footprint and retains a clearer maintenance path for erosion control.

What’s next: Applicant to provide revised plan sets (including a certified wetland scientist stamp) and evidence of wetlands monumentation before the building department will issue a permit.