Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Transportation Infrastructure topic

No spam. Unsubscribe anytime.

Council approves authorization for ODOT to work inside city limits on U.S. 24 pavement and bridges

3651044 · June 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Council authorized ODOT to remove and replace pavement and repair bridges on U.S. 24 between the U.S. 6 interchange and the Maumee River bridge; work is scheduled to be completed by Sept. 1, 2026 and may reduce lanes temporarily.

The Napoleon City Council on Monday introduced ordinance 020-25 granting the Ohio Department of Transportation permission to work within city limits to remove and replace pavement on U.S. 24 from the U.S. 6 interchange to the Maumee River bridge and to repair bridges within the same section.

Council members were told the work includes bridge repairs and that some locations will require major work. Staff said ODOT plans to advertise the project this fall and complete the work by Sept. 1, 2026. Speakers cautioned the work may temporarily limit traffic to one lane in each direction at times but said they expect emergency vehicles will be accommodated and that the city will be notified of ODOT’s schedule in advance.

The council introduced the ordinance and voted to move it forward to subsequent readings by roll call. Staff said the authorization is a routine step ODOT requires before performing work within municipal boundaries.