Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Conservation commission conditionally approves above-ground pool at 77 Briarwood Lane, requires backwash pit and proof of legal ad

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission granted a conditional Request for Determination approval for an above-ground pool at 77 Briarwood Lane, contingent on receipt of the required legal advertisement and installation of a 3-by-3-by-3-foot crushed-stone backwash pit to prevent discharging pool backwash into the detention pond/wetland buffer.

The Fall River Conservation Commission on Monday conditionally approved a Request for Determination (RDA) for an above-ground swimming pool at 77 Briarwood Lane, with two explicit conditions: the applicant must provide the legal advertisement placed in the newspaper, and the property must install a 3-by-3-by-3-foot crushed-stone pit for pool filter backwash rather than piping backwash into the nearby detention pond.

Conservation agent Dan…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans