Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Council reviews Ramble report on stormwater box culvert after basement flooding; staff recommends further investigation estimated at about $100,000
Summary
The Oshkosh Common Council on May 27 reviewed a final engineering report on a replaced stormwater box culvert after reports of basement flooding and heard staff recommendation for further targeted subsurface investigation estimated at roughly $100,000.
The Oshkosh Common Council on May 27 discussed the final report from Ramble Americas Engineering Solutions regarding stormwater infrastructure near a recently replaced box culvert and ongoing reports of basement flooding. Staff said a series of inspections had cleared some possibilities but that further subsurface investigation — including additional soil borings and permanent monitoring wells with transducers — was likely needed to better understand groundwater behavior near the culvert.
Public Works staff told the council that one of the four inspection methods used on the replaced storm sewer — electromagnetic leak detection — found only minor defects and “nothing was discernible in that connection between outside and inside,” meaning the replaced box culvert…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

