Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Street Design Traffic Calming topic

No spam. Unsubscribe anytime.

Commission refers Bassett Street paint-only traffic-calming plan for study

3426439 · May 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission voted to refer a staff study on applying painted drive lanes and a shared-lane marking on Bassett Street from Clement Street to North Gantt Avenue to slow traffic; staff will consult planning on visual narrowing and parking impacts before returning with a recommendation.

The Green Bay Traffic, Bicycle and Pedestrian Commission voted to refer for study a plan to add painted drive lanes and bike/shared-lane markings on Bassett Street between Clement Street and North Gantt Avenue to slow motorists.

A member presenting the request said the goal is speed reduction and that "all I'm asking for is paint on the road." Staff explained options including standard bike lanes, shared-lane markings (chevrons), and visually narrowed roadway striping that would create the feel of a narrower travel lane without removing parking. "For this case, your purpose is to slow down motorists," the staff member said, adding that the city has templates for shared-lane markings and can paint visually narrowed lanes to make drivers perceive a narrower 10-foot travel lane.

Staff noted gaps in the bike network around University Avenue and Humboldt and said the commission should avoid creating isolated bike lanes that dead-end without connecting facilities. Planning staff (Stephanie Hummel) was identified as a staff contact for evaluating how a painted treatment would fit with broader bike facilities; the presenting staff said they would consult the mayor's office and planning before returning with a recommendation.

Commission members discussed materials, maintenance and scale. One speaker said the machine-painted material used on a recent Erwin Avenue project cost about $800 for materials but wears quickly; staff said crosswalks and roundabout markings have not been repainted in years and that contractor rebates and setup costs can be significant. Staff recommended a trial limited to Bassett/Clement because the corridor feeds apartment complexes, Festival Foods and Kwik Trip and is a logical pilot location.

The commission motioned, seconded and voted to refer the proposal for a staff study and to return with a recommendation at a future meeting.