Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Roads Infrastructure topic

No spam. Unsubscribe anytime.

Germantown board adopts 2025 PASER road‑condition report; residents press for faster fixes

3426097 · May 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Village Board approved the 2025 PASER road‑condition report that will be submitted to WisDOT and serve as the baseline for the 2026 and 2027 road programs. Residents pressed trustees about schedule changes and immediate safety repairs for problematic curbs and bike hazards.

The Village Board on Monday adopted the 2025 PASER (Pavement Surface Evaluation and Rating) road‑condition report that staff said will be submitted to the Wisconsin Department of Transportation and used to prioritize the 2026 and 2027 road program.

The report uses WisDOT's 1–10 PASER visual rating scale and combines condition ratings with traffic volumes to prioritize reconstruction. Village staff told trustees the 2025 report will be the official baseline for the program that will guide multi‑year planning; ratings are subject to reevaluation in future cycles.

Why it matters: The PASER ratings inform which streets are scheduled for reconstruction or preservation and influence capital budgeting and timing; residents with roads moved out in the plan pressed trustees for clarity about timelines and immediate repairs.

Trustee Jan Miller pulled item E from the consent agenda to seek clarification after residents reported the schedule for particular streets had shifted several years later than expected. She asked whether the ratings and dates are fixed once the board approves the report. Public Works/engineering staff answered that the ratings are a snapshot and will be re‑evaluated in the next PASER cycle; traffic volumes also affect prioritization so a higher‑volume road with the same rating can be prioritized earlier.

Several residents spoke during public comment. Trustee Pieper and other trustees described specific safety complaints in subdivisions — including a two‑inch lip between curb and street that has caused bicycle crashes — and urged residents to report immediate hazards to DPW so crews can evaluate mitigation options. Staff said the next rating cycle (scheduled in 2027) will allow for an updated 10‑year program but acknowledged that annual adjustments are possible if deterioration accelerates.

Ending: The board approved the report and noted it would be submitted to WisDOT as the required annual/biannual filing; staff will accept resident reports of immediate safety concerns for mitigation while the multi‑year schedule remains the baseline for long‑range planning.