The committee discussed dispatch console motor failures, potential replacement costs, the 9-1-1 cutover schedule and a June 4 dedication ceremony; no console replacement decision was made and staff will research repair/replacement options.
Get email alerts on the Dispatch Cutover Dedication topic
No spam. Unsubscribe anytime.
Building Committee members reviewed readiness for the police move-in and the 9-1-1 cutover and discussed a technical issue with the dispatch workstations that could require equipment replacement.
Project and police staff reported that one of the two dispatch consoles has a failed lift motor and that the original motor is obsolete. An estimated replacement cost was discussed in the $10,000–$12,000 range for the motor or full unit. "These aren't your typical office desks. These are workstations for dispatch. They carry multiple monitors and multiple computers, so they're quite extensive," a police representative said.
Staff said they would investigate alternatives before authorizing a large purchase: checking with Norcom for used motors, contacting the original furniture vendor (Stanford Office Furniture) to explore options, and determining who is contractually responsible for equipment that was in storage. Committee members asked staff to report back with options and cost estimates.
On broader logistics, staff said the state's cutover coordination for the 9-1-1 system remains on track and that there is no change to the cutover date. The committee penciled in a public dedication ceremony for the new facility at 10 a.m. on June 4, and scheduled a public tour for May 8 following the building committee meeting to show parts of the facility that will be open for visitors. Committee members emphasized holding the ceremony before operational hiccups on cutover day and suggested limiting the event to about an hour.
Discussion vs. decision: the dispatch console motor issue was characterized as a technical problem requiring research; committee members did not authorize immediate replacement spending and asked staff to pursue used parts and vendor options. The cutover and ceremony dates were scheduled administratively and are subject to change if operational needs require.
Next steps: staff will (1) research replacement motors and used-equipment sources with Norcom and vendors, (2) determine responsibility for equipment condition during storage, and (3) finalize logistics and public notice for the May 8 tour and June 4 dedication.