Summary

City Engineer Fazari summarized active and planned capital projects including a $5.5 million wastewater Phase 1A under construction, Phase 1B in final design, a 1-million-gallon reservoir 90% designed, and a Martin Airfield study identifying 65 acres suitable for industrial use.

City Engineer Fazari (introduced as the city’s engineering lead) summarized major infrastructure projects, including active construction and near-term bids and design milestones.

“Total project cost about $5,500,000 and plan is to have construction continuing on throughout the end of this year,” Fazari said of the wastewater treatment plant Phase 1A upgrades (headworks, air piping and expansion of a concrete basin).

Fazari reported Phase 1B at the wastewater plant is in final design and will include a UV disinfection system, a large pond, new pump stations and a new irrigation distribution system to serve land adjacent to the plant; the city expects to advertise that work for bids later this year. He said Lift…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans