Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Silvertip construction to close single lanes on Highway 41; work expected to last around two to three months

3230073 · May 3, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Fultz Engineering said Caltrans-approved Highway 41 work will begin with tree removal and slope excavation and will use single-lane reversing traffic control weekdays 8 a.m.–5 p.m.; contractor says the Highway 41 phase should be complete in two to three months.

Brian Fultz, with Fultz Engineering, told the Fish Camp Planning Advisory Council that work to expand Highway 41 for the Silvertip development will begin after receiving Caltrans approvals and is scheduled to start Monday, with tree work followed by excavation of a rock slope between Fish Camp Lane and Bridal.

Fultz said the Highway 41 portion will use a single-lane reversal traffic control plan…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans