Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Public Works Roads topic

No spam. Unsubscribe anytime.

Engineer: road program to be advertised; dust-control screening installed at upper school

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Engineer reported the borough will advertise the road program for bids and that dust-control screening requested by residents and council has been installed at the upper school, though small gaps remain to be closed.

The borough engineer reported that the road program will be placed on the agenda for advertisement and bidding, and that dust-control screening at the upper school construction site has been installed.

An engineer/staff speaker said JP worked with council and residents on the screening request and “it is now installed.” He added there are some gaps where landscaping or a bush interferes and that JP has talked with the superintendent about closing those gaps. The engineer noted that the screens must attach to the fence and cannot be installed like ballfield netting; wind stabilization and maximum feasible height are constraints.

On the road program, staff said documents are nearly finalized and the program will be put out for bid, with alternates for walkway work tied to park equipment installation so the borough can capture liquid fuels paving value.

Next steps: Council will be asked to authorize advertisement for the road program and to review final bid documents; the engineer and staff will follow up to close screening gaps at the school.