Design Review Board selects revised mural design for Fifth Third Bank on Highway 9

3213079 · May 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Fifth Third Bank’s proposed mural at 13794 Highway 9 was returned to the board with two new design options. The board selected Option 2 (darker palette) and approved the change, concluding it met the form‑based code and wayfinding objectives.

Design Review Board members approved a revised mural design for the Fifth Third Bank building at 13794 Highway 9, selecting Option 2 after staff and the applicant presented two alternatives.

City staff presented two new design options submitted by the bank’s sign contractor to modify a mural the board had previously approved. The bank proposed updated color palettes and a slightly larger footprint for the mural as a wayfinding element for the building entrance.

David Michael, representing the applicant, said both options comply with the Deerfield/Crabapple permitted colors and that the material is a graphic film suitable for textured surfaces. Board members reviewed color swatches and how the mural would integrate with the building facade. No public commenters spoke on the item.

After discussion the board moved to approve Option 2, which uses a darker smoky palette and slightly larger graphic footprint than the previous design. The motion passed unanimously. Staff noted the bank must file the appropriate sign permit and that color/material details on the approved option would be recorded with the building permit application.

The board’s approval allows the applicant to proceed with the mural under the approved option; sign and building permit review will follow standard staff procedures.