Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Norwalk advances drainage work: $400,000 for Lockwood/Heather Lane and design work for Broad River outfall

3209905 · May 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The committee approved an additional $400,000 order on an existing drainage contract at Lockwood and Heather Lane to cover unforeseen rock excavation and poor soils, and authorized a separate Woodard & Curran design amendment of $397,700 for stormwater improvements downstream of Broad River Park as part of a phased Ponus area remediation.

The Norwalk Public Works Committee on May 20 approved two drainage-related actions: a contract order of up to $400,000 for continued drainage construction on Lockwood and Heather Lane, and an amendment to Woodard & Curran’s engineering agreement for design services related to stormwater outfalls downstream of Broad River Park for up to $397,700.

Jim Meehan and other engineering staff said the Lockwood/Heather Lane drainage construction is more than halfway complete and crews have encountered…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans