Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Design board approves addition for Needham DPW fleet maintenance building
Summary
The Needham Design Review Board approved site and building design for a roughly 12,000-square-foot pre-engineered maintenance addition to the Jack Cogswell building at 1407 Central Avenue, part of the DPW master-plan Phase 1; the project includes a deep ledge wall cut, geothermal wells and rooftop solar.
The Needham Design Review Board on April 28 approved the site and building design for Phase 1 of the Department of Public Works master plan: a 12,000-square-foot pre-engineered maintenance bay addition to the Jack Cogswell facility at 1407 Central Avenue.
Weston & Sampson project manager Tyler Koflice presented the proposal, which renovates an eastern bay of the existing garage for a tire maintenance bay and adds a new 12,000-square-foot maintenance garage with an exterior wash pad.…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

