City staff seek $59,000 living-shoreline assessment for three sites including JC Park
Summary
City staff described a DEP-funded predesign assessment by GHD Services to test shoreline conditions at three parks, including JC Park and Mangrove Park, to guide flood-resilience work.
Get email alerts on the Climate Resilience Shoreline topic
No spam. Unsubscribe anytime.
Boynton Beach City staff presented a task order with GHD Services for a living-shoreline assessment not to exceed $59,000, tied to a Florida Department of Environmental Protection grant, and described the work as predesign analysis for three potential project locations including JC Park and Mangrove Park.
City staff said the assessment will evaluate shoreline geology and site conditions so engineers can recommend the right combination of ‘green’ and traditional infrastructure. “Living shorelines are basically like hybrids of green infrastructure like trees and plants and all that stuff, plus if we need to the traditional, like, seawall or other type of, traditional infrastructure that would go for flood resilience,” said Alana, a staff member who outlined the DEP-funded work.
The commission discussion focused on scope rather than budget trade-offs; staff characterized the task order as prework required by the DEP grant and said the assessment will determine what type of installation — vegetation, structural elements or a hybrid — is appropriate at each site. The project list includes JC Park and Mangrove Park and one additional location identified in the grant documents.
No formal vote or final contract award was recorded in the meeting transcript. Staff indicated next steps are completion of the assessment under the DEP grant and subsequent design and permitting steps if the assessment supports construction.