Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Housing authority approves $498,943.35 boiler closeout, awards plumbing and smoke-detector contracts

AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Fall River Housing Authority board approved a closeout for a boiler and domestic water heater replacement and awarded multiple contracts, including a $25,500 plumbing job. The board accepted low-bid and second-lowest-bid awards after certification issues with one bidder.

The Fall River Housing Authority board on April 14 approved final closeout documents for a boiler and domestic water-heater replacement project and awarded several contracts for building repairs and safety upgrades.

The board approved a certificate of completion and closeout for the Boiler/Domestic Water Heater Replacement project at Cocktail Heights (Mass 6-10) in the amount of $498,943.35. Chairman Long called for a motion and the board voted in favor.

The board also awarded a contract for oil/gas piping replacement at Condominel Dios Towers (Mass 6-8) to the low…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans