Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Small Business Redevelopment topic

No spam. Unsubscribe anytime.

Commission approves Sun Bros Coffee redevelopment plan for small downtown site

2582676 · January 21, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The commission approved a redevelopment special exception for Sun Bros Coffee at 14 South Young Street, allowing a drive‑thru coffee use on a narrow, previously nonconforming lot after the applicant reduced impervious area and met landscaping and sign waivers.

The Ormond Beach City Commission approved a development order granting a special‑exception redevelopment plan for Sun Bros Coffee at 14 South Young Street, authorizing the coffee use and associated site changes on a narrow, nonconforming former vehicle sales lot.

Why it matters: The site sits just south of the U.S. 1/Granada corridor in a B‑4 commercial district. Staff and the planning board concluded the applicant reduced impervious surface from 95% to about 75% and proposed landscaping and parking that met the site’s constrained geometry. The planning board recommended approval 6-0.

Details: Planning director Steven Spraker summarized the waivers the applicant requested: reduced side‑yard landscape width (the site can provide 3 feet where 12 is standard) and two wall signs totaling 41 square feet where the code would normally allow a smaller sign. The site will be used principally as a drive‑thru coffee operation; an applicant engineer was present and staff said they would consult with FPL about an on‑site pole that could conflict with the driveway alignment.

Outcome: Commissioners voted to approve Resolution 2025‑44 on a roll call. The approval establishes conditions and an expiration for the special exception redevelopment plan; the applicant must still complete required permits and any utility coordination.

Ending: Staff will finalize the development order with the conditions approved by the commission.