Monroeville hearing board approves parking variance for Pyramid Healthcare at 279 Center Road
Summary
The Monroeville Municipality and Zoning Hearing Board approved a variance allowing Pyramid Healthcare to provide 64 parking spaces at a planned inpatient substance-use treatment facility at 279 Center Road, citing existing building constraints and an operator parking study.
Get email alerts on the Parking Variance Pyramid topic
No spam. Unsubscribe anytime.
The Monroeville Municipality and Zoning Hearing Board on March 5 approved a parking-variance request allowing Pyramid Healthcare Inc. to provide 64 parking spaces at 279 Center Road, rather than the higher number called for in the zoning ordinance.
Pyramid’s attorney, Jeff Reese, asked the board for the variance, saying the existing structure and lot layout limit the number of spaces that can be built. "The maximum number of spaces that can be developed is 64," Reese said during the hearing. He told the board the company would otherwise face demolition or major reconstruction to meet ordinance parking counts.
Jonathan Wolf, identified as president and founder of Pyramid Healthcare, described the proposed use as a residential substance-abuse treatment facility with medical detox and separate inpatient rehabilitation units for men and women. "We go out and fetch a hundred percent of the patients who've come into treatment," Wolf said, explaining the operator’s model reduces vehicle turnover and visitor parking demand. He also said Pyramid expects to create roughly 84 jobs at the facility.
Jeff Davis, introduced as Pyramid’s executive vice president for engineering, construction and facilities, described the building as about 49,000 square feet, two stories, and occupying roughly 75% of the parcel. He said Pyramid plans to expand the existing 42 spaces to 64 by reconfiguring and adding stalls where feasible and repainting lines. Davis referenced a two-day parking study from a similar Pyramid facility in Wilkinsburg, where a 58-space lot recorded a peak of 52 occupied spaces during shift changes; he said that pattern informed Pyramid’s expectation that 64 spaces would be adequate.
Board members asked about staffing patterns, deliveries and site screening. Kevin (last name not specified on the record) confirmed Pyramid expects shift overlap during mornings and evenings, estimating about 20–25 cars present at peak times. Pyramid stated no exterior building expansions are planned other than parking work; interior renovations are proposed. The applicant also said a conditional-use application for the treatment facility is pending with the planning department.
After discussion, a board member moved to approve the variance and another seconded. The board approved the request by voice vote; individual roll-call votes were not recorded in the transcript.
The variance approval allows Pyramid Healthcare to proceed with its planned interior renovations and the parking reconfiguration described at the hearing, subject to any conditions imposed by planning or zoning staff during subsequent permitting and the pending conditional-use review.