Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Planning Docket Roundup topic

No spam. Unsubscribe anytime.

DRC reviews annexation, rezonings and development plans; engineers and staff press drainage and traffic details

2516968 · March 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The City of Apopka Development Review Committee on March 5 considered a series of land‑use and development items, including an annexation application, rezoning proposals, plats and construction site plans.

The City of Apopka Development Review Committee on March 5 considered a series of land‑use and development items, including an annexation application, rezoning proposals, plats and construction site plans. Committee members and applicants focused questions on stormwater performance, off‑site utilities, traffic mitigation and permit sequencing.

Annexation and rezonings: Staff opened an initial annexation discussion for the Onditch North property (near the Lake County line); the applicant was present but committee comments were limited and the city attorney was still reviewing a planning comment, according to the applicant’s representative, Luke Classen of Appian Engineering. For 724 West Keene Road the applicant proposed a future land‑use change to Residential Medium (10 dwelling units per acre) and rezoning to RMF (residential multifamily); the applicant was available to answer questions but no substantive policy decisions were recorded. Golden Gem Estates and a related rezoning in the Kelly Park area were presented as requests to rezone to a transition designation; applicants attended and DRC staff raised no additional written objections during the meeting.

Construction site plans and early‑start permit requests: At 4301 Hogshead Road the applicant sought to stage operations in two phases: modular office installation that could be occupied within weeks and a separate, longer off‑site utility extension that could take months. The applicant asked about a temporary certificate of occupancy (TCO) or an early‑start permit to occupy the modular building while off‑site utilities are completed. City staff advised submitting separate permit packages (separate permit numbers) for the modular building and the off‑site utility work, and instructed the applicant to apply through the city’s online permitting portal for an early‑start or building permit. The applicant said deliveries would be low (about six or seven trailer deliveries per day) and projected six on‑site employees, and expected that trips would be below the traffic‑study threshold of 50 average daily trips.

Hunt Club Medical Office and stormwater concerns: A second submittal for a medical office at 72715 E. Semoran Blvd. prompted an extended exchange about local flooding. Selby Weeks of Klima Weeks Civil Engineering and city staff discussed the site’s master stormwater pond (part of the Apaka Gateway Center Planned Development, Ordinance No. 1948, adopted June 2007). City staff and the project engineer said the pond was designed under landlocked criteria and, based on permit data and site observations after recent hurricanes, did not show evidence it had overtopped; the project engineer said the proposed building area was under the original design thresholds. The meeting record notes that the homeowners association (the POA) is responsible for pond maintenance under recorded covenants.

Traffic calming and internal street design: For the Onditch South major development plan staff and the applicant discussed potential high‑speed “racetrack” concerns on a long north‑south entry road. The applicant said a roundabout at the main intersection had been proposed and staff suggested additional mid‑block measures — small planted traffic circles, speed humps or other treatments used in other Kelly Park projects — to reduce speeds and add landscaping. Fire department staff asked to be briefed on any traffic‑calming devices to ensure emergency vehicle access and to confirm trucks can be routed through the proposed treatments.

Other docket items: The DRC reviewed the Kelly Park Village plat at the intersection of Kelly Park Road and Plymouth‑Sorrento Road (applicant present), an Apopka Business Center West Bays modification (engineering comments from public services only), Golden Gem Estates major development submissions and a request to vacate a portion of an easement around a lift station in the Oak Point subdivision (applicant cited the lift station construction as the reason for the vacation). Several engineering comments and a fire turning‑radius concern for Golden Gem Estates were raised; the applicant’s consultant said a revised turning analysis was submitted to staff for review.

Ending: Staff closed the DRC review after the applicants confirmed they would submit required permit packages, traffic analyses where necessary and clarify outstanding engineering comments. No formal votes or DRC motions were recorded in the transcript for these planning items.