City staff reported a 30% design for the South Crest (Cherry Creek) tank replacement, bid timeline for Wells 7 and 8, a SCADA wastewater upgrade under contract, an expansive reporting workload, and a proposed water master plan budgeted in the current year.
City staff told the Cloverdale City Council that multiple water-system projects are advancing, including a 30% design for a South Crest tank replacement, preparations to replace Wells 7 and 8, an upgrade to the wastewater SCADA control system, and plans to update the city’s water master plan.
The South Crest work is at roughly 30% design and staff expect the design deliverable in April; the project would replace one existing tank with two tanks and, according to staff, increase usable capacity to “over double” the current amount at that site. Staff are evaluating tank coating options and said a longer-life coating (30–40 years) may be cost-effective on the front end compared with short-life coatings requiring frequent recoat work.…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat