The Escanaba City Council took the following formal actions on Feb. 20; vote outcomes are shown as recorded at the meeting.
Webster Park splash pad — Approved The council approved the low construction bid from Wolechka Inc. of Kearney, Michigan for $207,400 to build the Webster Park splash pad. Funding: the project budget was described as $200,000 with $150,000 from the DNR trust fund and $50,000 in city matching funds; staff said the city’s remaining responsibility on the current bid is approximately $57,400. The contract passed on roll call with council approval.
Biosolids removal (three-year contract) — Approved Council approved retaining FSO Management (Oconto Falls, WI) for biosolids disposal under a three-year arrangement that includes a $12,500 mobilization fee and a unit rate discussed at $0.27 per gallon. Staff described the contract as an interim measure while the city studies long-term disposal/treatment options. Approved on roll call.
DWSRF project plan preparation (C-2AE) — Approved Council approved retaining C-2AE for preparation of the Drinking Water State Revolving Fund (DWSRF) project plan for an amount not to exceed $20,000. Staff explained the EGLE project plan is required to apply for SRF funding and is valid for five years. Approved on roll call.
Wastewater CCTV/NASSCO televising — Approved Council authorized up to $500,000 to hire Tunnel Vision to clean and televise roughly 24 miles of sanitary sewer and obtain NASSCO PACP ratings; staff was directed to return with lining cost estimates. Approved on roll call.
MALL (maximum allowable headworks loading) study (Fishbeck) — Approved Council approved Fishbeck’s engagement, not to exceed $31,100, to perform a MALL/local limits evaluation to assess what the plant can accept and to help locate PFAS/heavy-metal sources. Approved on roll call.
Replacement boiler, public safety — Approved Council approved replacing one failed boiler at the public safety facility with a Weil-McLain Evergreen (specified 299k BTU model in the discussion) from Berger and King in the amount of $14,525. Approved on roll call.
Traffic control orders No. 1026–1030 (as amended) — Approved Council approved a set of traffic-control orders to install speed-limit and yield signs at specific intersections and a no-parking segment at a marketplace block (orders dated Oct. 15, 2024, filing). Approved on roll call.
Fuel tank monitor system, marina — Approved Council approved purchasing a new fuel tank monitoring system for the marina in the amount of $14,045.32. Staff said the system will be compatible with a future fuel-tank replacement and is required for state reporting.
Votes recorded at the meeting were taken by roll call; individual councilors announced “Yes” during each item’s roll call as recorded in the meeting transcript.