Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Officials discuss DeSoto Bridge replacement, Bradenton‑Palmetto corridor PD&E and flyover option

2482164 · March 4, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

County and city leaders reviewed FDOT’s PD&E work on capacity alternatives across the Manatee River, described proposed DeSoto Bridge replacement features and debated whether to endorse a flyover alignment to increase north‑south throughput.

County and municipal leaders at a March 3 joint meeting reviewed ongoing Florida Department of Transportation (FDOT) planning and environmental (PD&E) work for the Bradenton‑Palmetto corridor and the DeSoto Bridge replacement.

FDOT consultant remarks summarized the design concept for a proposed DeSoto Bridge replacement: four 12‑foot travel lanes, a concrete median, inside shoulders and a 10‑foot pedestrian/bicycle path on both sides. County staff said the DeSoto replacement project could be bid next January and that the PD&E corridor study is expected to finish in about 12 months.

Why it matters: The DeSoto Bridge…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans