Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Get email alerts on the Land Use Road Modifications topic
No spam. Unsubscribe anytime.
Doña Ana County panel conditionally approves road-standard modification for proposed Steel Subdivision (SD24-015)
Summary
On Jan. 27, 2023, the Doña Ana County Planning and Zoning Commission granted conditional approval for a road modification request for the proposed four‑lot Steel Subdivision (SD24‑015), allowing gravel surfacing in place of full road improvements and restricting further land division until access roads meet county standards.
Get email alerts on the Land Use Road Modifications topic
No spam. Unsubscribe anytime.
Doña Ana County Planning and Zoning Commission members on Jan. 27, 2023, voted to conditionally approve a road‑standards modification for Steel Subdivision (case SD24‑015), allowing a five‑inch gravel surface over ten inches of compacted native soil on unpaved access roads instead of the full pavement and drainage improvements normally required by the county.
The approval applies to a proposed summary subdivision west of Prairie Dog Road between Corona Road and Arroyo Road that would create four lots. County staff recommended the modification “based on the findings of fact, and staff analysis and agency comments,” and the commission attached a condition that “no further land division be created until all access roads are brought up to county standards,” language read into the record by staff member Charlene.
The modification concerns improvements to Prairie Dog Road and Arroyo Road, both described in the staff presentation as unpaved and, according to staff, private roads; Corona Road was described as a paved county road. Staff presented a geotechnical report supporting a gravel section consisting of five inches of gravel over ten inches of compacted native soil. The subdivision plat shown to the commission identifies Lot 1 fronting Corona Road; Lot 2 fronting Arroyo Road; and Lots 3 and 4 fronting Prairie Dog Road. The applicants are listed on county materials as Borderland Engineering and Surveying as agent and Salvador C. and Cruz Olivia Placentia as the property owners.
Applicant Steve Peel of Borderland Engineers told commissioners the area is isolated, that Prairie Dog has “very low” traffic, and that the geotechnical borings indicate a gravel base should support required loads. A resident, Stacy Hyman, asked whether gravel would be placed on both Arroyo and Prairie Dog roads and raised concerns that gravel might wash away in the drainage areas; staff and the applicant responded that the proposal covers both roads in question and noted an existing 30‑foot drainage and utility easement at the end of Arroyo Road. Staff also told the commission that Arroyo Road currently ends at a county drainage channel and is not expected to function as a through road in the foreseeable future; the county’s MPO (Metropolitan Planning Organization) designation would need to change if Arroyo Road were ever removed as a planned through road.
Commissioner Lier moved to conditionally approve the road modification request for SD24‑015 consistent with staff analysis and agency comments; Commissioner Jimenez seconded. The roll call recorded unanimous votes of yes from the commissioners called, and the motion passed.
The commission did not adopt any additional conditions such as a maintenance agreement for the gravel surface or a schedule for upgrading the roads; the sole stated condition requires that no further land divisions occur until access roads meet county standards. The staff presentation noted the Development Review Committee recommended the modification as an alternative design pursuant to Article 6 (Development Construction Standards) of the Unified Development Code (UDC), provided the modification would not be detrimental to public health, safety or welfare.
The decision affects property owners and residents who use Arroyo Road and Prairie Dog Road and leaves open a future county or MPO decision if Arroyo Road were ever redesignated as a through road. The commission’s conditional approval permits the immediate subdivision filing under the specified road‑section treatment but restrains further division until the county’s full access standards are met.
Votes at a glance: SD24‑015 (Road modification for Steel Subdivision) — Motion to conditionally approve per staff recommendation (five inches of gravel over ten inches compacted native soil; no further land divisions until access roads meet county standards). Mover: Commissioner Lier. Second: Commissioner Jimenez. Roll call: unanimous yes. Outcome: approved.

