Commissioners reviewed a proposed access‑management approach that limits primary driveway cuts and allows additional connections only after traffic analysis and planning commission review. The discussion flagged inconsistencies between the county’s subdivision rules, minor/major subdivision definitions and driveway‑spacing language.

Planning staff reviewed proposed language to limit the number of direct driveway connections from parcels onto state‑maintained roads and to create a process for approving additional connections where a site‑specific traffic impact analysis demonstrates safety or circulation benefits.

Why it matters: staff and commissioners said numerous recorded subdivisions along Route 60 and elsewhere have produced multiple driveways that compromise safety and corridor mobility; the county’s subdivision language also contains internal inconsistencies that have allowed varying interpretations over time.

Key proposals and discussion points: - Baseline rule: staff said the draft would generally limit newly created parcels that front a state road to a single permitted access connection unless the applicant demonstrates, with a site‑specific traffic analysis, that additional connections improve safety or circulation. - Additional connections and thresholds: on major and minor arterials (examples include Route 60) applicants could seek up to two connections as part of design; further additional connections would require planning commission review and possibly Board of Supervisors action after an applicant provides the required traffic and safety analysis. On rural collectors or local roads, the planning director could administratively approve a second connection when justified. - Driveway spacing and access management: commissioners discussed reinstating or clarifying driveway‑spacing measures (staff noted typical VDOT spacing standards and that some past county access‑management language had been removed). Suggested spacing numbers were raised during the discussion; staff said that VDOT concurrence would generally be required on driveway spacing and turn‑lane decisions on state roads. - Inconsistent subdivision language: commissioners identified contradictory passages in the subdivision ordinance — for example, a “minor subdivision” provision describing up to 10 lots fronting a state road and other text limiting parcels to one access connection — and asked staff to reconcile the code so it clearly controls driveway cutting, shared driveways, private roads and minor vs major subdivision pathways.

Examples and illustrations: staff showed two illustrative site plans. In one case a large parent parcel already recorded with multiple subdivided lots had many direct cuts onto Route 60; staff said the draft language would encourage either consolidation of access, a private road or cross‑parcel circulation to reduce direct driveway density on the arterial. In another example, a proposed minor subdivision that had not been recorded could be redesigned with shared driveways and a smaller number of access points, or it could seek administrative relief for a second connection on a rural collector.

Next steps: staff recommended additional drafting work to reconcile contradictory subdivision provisions, to restore clear access‑management spacing rules with VDOT coordination, and to bring the two illustrative examples back for the commission’s March workshop.