Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Vero Beach airport reports passenger surge, terminal renovation and taxiway projects ahead

2411546 · January 17, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

Airport Director Todd Shearer told the Vero Beach commission the airport nearly doubled Breeze passenger traffic in 2024, recorded a record number of aircraft operations, awarded a terminal renovation contract and is planning taxiway, parking and other capacity projects.

Vero Beach Airport Director Todd Shearer reported a near doubling of passenger traffic for one commercial operator in 2024, record yearly aircraft operations and several infrastructure projects now moving into design or construction.

Shearer told the Vero Beach Board & Commissions that Breeze carried 85,728 passengers on 469 flights in 2023 and 175,995 passengers on 1,604 flights in 2024. He said Breeze's reported enplanements for 2024 did not by themselves push the airport over the 100,000 commercial-enplanement threshold used by FDOT for some funding calculations; final totals that include fractional-jet and charter operator reports to the FAA are not yet published.

Shearer said council recently awarded the terminal renovation bid to Procter Construction and that contractor work is scheduled to start in March with substantial completion by December. The renovation will add covered walkways, a covered baggage-claim…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans