Council accepts city engineer’s observations on Bird’s Way depressions
Summary
The council accepted the city engineer’s report concluding roadway depressions on Bird’s Way resulted from asphalt settlement over time rather than unusual subbase problems; staff had excavated affected patches to inspect soils.
Get email alerts on the Streets And Roads topic
No spam. Unsubscribe anytime.
Council members voted to accept the city engineer’s observational report regarding depressions in Bird’s Way and authorized resolution No. 25‑08 accepting the engineer’s observations.
City staff described a field inspection and excavation of depressed patches to determine whether the depressions were caused by subgrade deficiencies or by settlement of asphalt placed over time. Aaron Bristow, city engineer, said the excavations and hydrovac investigation showed soils beneath the patches did not differ materially from adjacent soils and that the observed depressions were consistent with asphalt settlement likely caused by inadequate compaction when the patches were placed.
Bristow explained compaction considerations and how different compaction equipment produces different consolidation over time. Staff said the crews had spent a day excavating and inspecting the areas and had prepared a written engineer’s observation report for council review.
A member of the public thanked staff for the report. The council approved the resolution by roll call.