The committee heard an accounting update from consultant Mark Boyd on special revenue funds, capital reserves and the tax-increment financing (TIF) fund, discussed waterfront dock and building-flooring capital requests, and considered a $30,000 municipal infrastructure study to evaluate space needs and options for town offices and public safety.

Accounting consultant Mark Boyd reviewed FY2024 bookkeeping corrections, special revenue and reserve balances, and several capital proposals during the Feb. 11 budget meeting.

Boyd said he reconciled special revenue funds and starters, noting the town’s TIF fund balance had been $558,000 after allocations and that it will likely finish the fiscal year near $450,000 after planned Aquatic Park and fish-screen spending. He also reviewed the excise-reserve schedule used to pay road-project debt and said the reserve balances should cover scheduled debt service for the next several years as long as excise revenues remain stable.

Capital requests and facilities work

Committee members reviewed a list of capital proposals including SCBA equipment for the fire department, replacement passenger vans for parks and recreation, composite docks for the town park, vinyl plank flooring for the town office, parking-lot sealcoating and striping, and a gazebo for Town Park. Estimated quotes were presented for those items; for example, a dock proposal was discussed in the neighborhood of $58,000 (quote details to be confirmed) and flooring quotes referenced roughly $60,000 for heavy-duty vinyl plank covering the foyer, hallway and offices.

Transfer station project and financing

The transfer-station upgrade remains a major capital consideration. Boyd and staff discussed an engineering-driven plan with an estimate that could approach $1.1 million once engineering, design and construction are combined. Boyd suggested the town could use reserve funds to pay for engineering and design this year, then draw a construction loan next fiscal year, which would limit interest exposure to the period when construction funds are actually drawn.

Municipal infrastructure study

Town staff proposed a municipal infrastructure (needs-assessment) study, with an estimated budget item of about $30,000 in the proposed materials. The study would inventory space needs, evaluate options (including whether to move ambulance operations or police functions and to repurpose the current building for public safety), and provide design guidance to inform any larger construction or renovation projects.

TIF and sidewalk projects

Staff also outlined potential TIF projects and sidewalk engineering needs on Main Street and Green Street. The consultant warned that design scopes as currently drafted could cost more than grant awards will cover; the likely path is to build to grant-funded scope and hold further improvements as optional add-ons if local funds become available.

Budget timing and next steps

Boyd advised the committee that some budget items currently shown in the operating budget (for debt service) are already satisfied by reserves and thus could be removed from the tax-raise line to avoid double-counting. Committee members asked staff to provide clearer project scopes, quotes and a priority schedule so the board can weigh whether to fund designs now or delay construction until next year. No formal votes were recorded on the capital requests at the meeting.

Ending

Committee members asked staff to refine costs and schedules, identify possible grant matches, and return with revised project lists and impact analyses before the committee finalizes recommendations to the select board.