Planning commission grants preliminary approval for Specialty Lubricants addition, subject to staff conditions and BZA variance for parking
Summary
The commission granted preliminary plan approval for a roughly 49,000 sq ft addition to Specialty Lubricants’ 67,000 sq ft facility, subject to staff comments, documentation of materials and colors, stormwater and wetland requirements, and a Board of Zoning Appeals variance for parking.
Get email alerts on the Development Projects topic
No spam. Unsubscribe anytime.
The planning commission on Feb. — gave preliminary plan approval to Specialty Lubricants for an expansion of its manufacturing and distribution facility, subject to standard staff conditions and several items to be completed before final plan approval.
Company president Steven Pajansky and architect Jet Sorbo told the commission the project proposes an approximately 49,000-square-foot addition to an existing 67,000-square-foot building, adding two loading docks, a dock door serving a trash compactor and an outdoor pallet storage area. The applicant said the outdoor pallet area responds in part to a fire department preference to reduce indoor pallet storage.
Planning staff (report dated Feb. 2) recommended preliminary approval while listing about nine items to resolve before final plan approval, most described as minor drawing and numeric clarifications. Staff noted the building area in the data table must include a second-floor mezzanine shown elsewhere on the plan. Staff also recommended a clearer site plan that shows scaled dimensions, final photometrics with a full horizontal cutoff at property lines, and final stormwater drainage details for city engineer review.
Parking and zoning: staff and the commission discussed parking counts and code-required spaces. Staff recommended the applicant pursue a variance from the Board of Zoning Appeals (BZA) to reduce parking; the commission supported preliminary approval while the applicant seeks a BZA variance concurrently with final plan preparation.
Environmental and infrastructure requirements: commission members and staff asked for a wetlands delineation or at least a wetland specialist walkthrough; the applicant must execute a long-term stormwater inspection and maintenance agreement for the proposed detention pond; and the city engineer will review stormwater calculations during final review. Fire-safety staff said the size of the addition will require sprinklers and extension of the fire-alarm system; the applicant must confirm whether an additional fire hydrant or another riser is needed.
Architecture and landscaping: the applicant proposes tilt-up precast concrete panels painted to match the existing building’s colors rather than repeating the existing masonry. Staff asked the applicant to document materials and exact paint colors on the final plans and to bring color samples. Commissioners suggested options to make the new facade visually compatible with the existing building, including investigating elimination of proposed upper windows in the addition in favor of painted panel details on the lower façade to mimic existing metal louvers, and adding evergreen screening and additional landscaping at key transition points. Staff recommended board-on-board fencing rather than chain link for the outdoor pallet storage area; the applicant indicated willingness to provide the board-on-board fence.
After discussion the commission moved for preliminary plan approval subject to staff comments, with documentation of materials and colors, an investigation of the window treatment versus painted panel option, compliance with stormwater, wetlands and fire-safety requirements, and the applicant’s pursuit of any necessary BZA variance for parking. The motion was seconded and the commission voted in favor.