Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commission recommends Fulton Science Academy use of Westside office building for pre-K/elementary with traffic conditions

2255795 · February 6, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Alpharetta Planning Commission on Feb. 6 recommended approval of a master plan amendment and conditional use that would allow Fulton Science Academy to reuse an existing two‑story office building at 8995 Westside Parkway for pre‑K and elementary education, in a phased plan capped at 600 students.

The Alpharetta Planning Commission on Feb. 6 recommended approval of a master plan amendment and conditional use that would allow Fulton Science Academy to reuse an existing two‑story office building at 8995 Westside Parkway for pre‑K and elementary education, in a phased plan that limits enrollment to 300 students initially and up to 600 once the second-floor tenant vacates.

Staff presented the proposal as a phased reuse: the existing second‑floor professional tenant would remain through an interim period (the applicant indicated the tenant will remain until about Feb. 19, 2028), allowing the school to occupy the first floor for an initial enrollment of roughly 300. When the second floor becomes available, the school would expand and increase enrollment to a maximum of 600 students. Planning staff tied the conditional use to a site plan with play areas,…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans