City staff reported construction progress on a new McAllen campground—parking, archery range, gazebo, restrooms, docks, campsites and trails—and commissioners directed staff to run an online naming survey and return name options at the next workshop.

McAllen City Commission workshop attendees received a staff update on construction progress at the city’s new campground and directed staff to run an online survey to collect public input on the facility’s name.

City staff presented progress on multiple amenities and site work and said they need a finalized name to begin marketing and branding. The commission agreed to return with naming options after staff compiles public feedback and staff-provided keywords.

The update described work across the site. Staff said the planned parking lot follows the original scope of work and includes 50 parking spaces, one accessible van space and two additional accessible spaces. A storm drain system is included in the scope to assist local water flow.

Work at the archery range has advanced: rebar has been placed for the covered area and staff reported concrete was scheduled to be poured the week of the meeting, with posts and the roof to follow. The covered archery area is 28 feet by 82 feet and the shooting range from that area to the targets is 64 feet. A safety berm around the range also has been formed, staff said.

Contractors completed welding for the gazebo frame and structural inspections have passed for that structure and the nearby restroom. Staff reported the restroom currently has 8 feet of cinder block above the finished floor and is being built to a planned height of 12 feet; plumbing and electrical rough-ins are in place.

Both north and south boat docks were described as prepared at the shoreline with additional foundation dirt added; staff said dock materials are on order but lead times are pending. The campsite area has 12 camp pads marked; staff said concrete work for the fire pit was scheduled to begin Wednesday of the meeting week and to take about two days, and cedar posts to outline the pads were on order.

Trail work is underway: staff reported approximately 2,400 linear feet of trail has been defined and filled with granite, which they said equals about 40% of the total planned trail length. Photos shown to the commission depicted the gazebo, restroom and cleared shoreline where trails and launches will be built.

On naming and branding, commissioners discussed options staff had brought back from a prior workshop and said they favor including “McAllen” in the facility name so visitors can easily identify the site as a city asset. Several commissioners suggested branding the overall site as “McAllen Campground” (or similar) and giving individual amenities their own names, following the approach used for other city facilities. Commissioners suggested using pro bono help from local advertising professionals or holding a community input process; one commissioner recommended a quick online survey to gather public suggestions.

Commissioners gave staff direction to run an online survey, assemble results and return naming options at the next workshop. A commissioner asked staff member Phil to provide keywords for the survey, and staff member Cesar was asked to prepare the survey tool. No formal vote was recorded on the naming approach.

Next steps identified by the commission were: complete the remaining construction and inspections, finalize lead-time-dependent dock deliveries, complete fire-pit concrete and cedar-post installation on the camp pads, finish the remaining 60% of the trail fill, and collect public input on the campground name. The commission scheduled consideration of the survey results and naming options at the next workshop.