Get Full Government Meeting Transcripts, Videos, & Alerts Forever!
Committee asks staff to return with cost and maintenance estimates for upgraded Washington Avenue sidewalks
Summary
Members instructed staff to study multiple pavement and streetscape materials for Washington Avenue, weigh maintenance implications and report back with estimates and samples before the committee decides on a preferred option and use of Geo Bond funds.
The committee discussed three levels of sidewalk treatment for Washington Avenue — red‑tinted concrete, specialty stamped or shell concrete, and higher‑end textured stone/paver approaches — and asked staff to return with cost estimates, maintenance plans and material samples. Commissioners stressed the need to consider long‑term maintenance and repair, the frequency of utility cuts, and the city’s…
Already have an account? Log in
Subscribe to keep reading
Unlock the rest of this article — and every article on Citizen Portal.
- Unlimited articles
- AI-powered breakdowns of topics, speakers, decisions, and budgets
- Instant alerts when your location has a new meeting
- Follow topics and more locations
- 1,000 AI Insights / month, plus AI Chat

