Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Bennington Monument topic

No spam. Unsubscribe anytime.

BGS reports planning study and temporary protections for Bennington Battle Monument

2137529 · January 22, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

BGS said a planning and preservation study for the Bennington Battle Monument is underway after masonry deterioration and interior ice buildup were documented; a temporary fence has been installed to protect visitors while the study continues.

At the Jan. 21 Senate Institutions committee meeting, Buildings and General Services reported that the Bennington Battle Monument is part of a preservation planning study after staff documented significant masonry deterioration and interior moisture that causes ice buildup.

Manoli told the committee that stones are chipping and falling from the monument; the department has installed a temporary fence around the monument to keep visitors at a safe distance while the study evaluates repair options. BGS described the study as cataloging cracks and assessing the monument’s interior moisture problems; the study will feed planning for a preservation and stabilization project that may include a covered entry and perimeter work.

Senators requested copies of the study; Manoli agreed to provide the report to the committee and to post it through the committee assistant. BGS said limited short-term monitoring and fencing are in place while long-term funding and scope are determined.

Ending: BGS said it will provide the committee with the monument study and continue preservation planning while maintaining temporary public protections.