Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Get email alerts on the Infrastructure Stormwater topic

No spam. Unsubscribe anytime.

Board approves MOU with NDOT for Craighead sidewalk stormwater maintenance

2119412 · January 15, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Metropolitan Board of Fair Commissioners unanimously approved a memorandum of understanding with the Nashville Department of Transportation (NDOT) to accept and maintain stormwater infrastructure tied to the Phase 4 Craighead sidewalk extension, including a clarification removing Metro Parks from ownership language.

The Metropolitan Board of Fair Commissioners on Jan. 13 voted unanimously to approve a memorandum of understanding with the Nashville Department of Transportation that assigns responsibility to the fairgrounds for maintaining stormwater infrastructure installed as part of the Phase 4 Craighead sidewalk extension.

The MOU covers stormwater features that will collect runoff from the new sidewalk and discharge it into a permeable paving parking lot owned by the fairgrounds. Metro Legal and NDOT reviewed the draft; board members proposed a minor wording change during the meeting to remove Metro Parks from the ownership language. "The collected runoff will be discharged into the permeable paving parking lot owned by fairgrounds," the amended sentence now reads, as noted by Metro Legal during the meeting.

Board Chair Jasper Hendrix called for the motion to approve the MOU; a board member moved, a second was recorded, and the board voted "aye" with no opposition. Director Laura Womack (executive director) said the design and stormwater calculations were reviewed by Metro Water and NDOT before the MOU was finalized. A board member asked about contingency plans for unusually heavy rainfall; Womack said Metro Water had run volume scenarios and incorporated those in the infrastructure design.

The MOU also requires fairgrounds staff to monitor and clear the drainage features periodically to prevent obstructions. The board amended the draft during the meeting to clarify ownership of the receiving permeable paving parking lot and approved the MOU as amended.

Votes at a glance - Approval of minutes from previous meeting — passed unanimously (motion moved and seconded; no recorded opposition). - MOU with NDOT for Craighead Phase 4 sidewalks/stormwater — approved unanimously as amended; amendment removed Metro Parks from ownership language; contingency and design oversight by Metro Water noted. - Motion to adjourn — approved unanimously.

The board indicated the MOU does not change Metro Water's role in sizing or permitting the stormwater features; rather it records operational responsibilities for the fairgrounds to maintain the drains once built. The board did not record a roll-call vote with member names in the public transcript.