Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Commissioners approve $37,450 change order for Clark Farm Road design, county engineer recommends added paving

2085010 · January 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The board approved a $37,450 design change order with Parker Engineering for Clark Farm Road, covering a drainage-easement plat ($3,250) and engineering to pave a short section of W.D. Peacock Road (design portion $34,200); the engineer and staff discussed estimated construction cost and T‑SPLOST funding.

The Bullock County Board of Commissioners unanimously approved a $37,450 change order with Parker Engineering for additional design services on the Clark Farm Road project.

Brad Deal, Bullock County engineer, told the board designers identified a low-lying area that holds water during rain events. The change order covers two elements: preparing a plat and adding a drainage easement to discharge stormwater to a nearby wetland (estimated $3,250), and engineering work related to…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans