Summary

City staff presented call volumes, response times and cost options for expanding public safety facilities. Staff and chiefs recommended considering a south‑end station to improve long‑response times in new growth areas; council asked for a formal needs assessment and clearer forecasts before committing to bonding

Mapleton staff and public safety leadership reviewed recent call volumes, response times and estimated costs for staffing and building additional public safety facilities; council asked staff to produce a formal needs assessment before deciding on construction or bond timing.

City administrator Corey and fire staff presented detailed call data and budgets used to evaluate options for expanding the city’s public‑safety footprint. Staff said Mapleton’s annual call volume in recent years has averaged roughly 833 calls per year in total, with about 500–580 calls inside city limits in 2025 to date; staff said roughly 40% of the department’s total callouts involve responses outside city boundaries under mutual‑aid arrangements. Staff reported roughly 80% of calls are medical/emergency medical services (EMS).

Staff and chiefs said citywide average response time for Mapleton calls was about 5 minutes and 52 seconds, but response times increase in the southern growth areas: south of 1600 South the average was cited as about 8 minutes, and the far south portion (near 2600 South) showed an average near 8 minutes 50 seconds on the snapshots staff provided. The department reported 49 incidents during the reporting window when multiple incidents occurred simultaneously — about 8% of calls — which affects unit availability.

Fiscal figures presented included an FY2025 fire department expenditure note and staff estimates for fully staffing a south station. Staff said compensation and benefits are the major portion of operating costs; they estimated the annual personnel cost to staff a full additional station (three shifts, each with a captain, an engineer and three firefighters per shift) at roughly $1.88 million (not including equipment). Capital cost estimates under discussion included an expansion of the existing public safety building at about $3–5 million (land and construction), a new south station on donated land estimated in the $3–6 million range for a building, and a single centralized new station (land purchase and building) with a higher order‑of‑magnitude capital cost in the low‑to‑mid tens of millions (staff cited $12–15M as a planning range for a central, large facility). Staff also presented bond‑payment scenarios to illustrate tax impacts for different project sizes.

Council members offered differing perspectives. Several said growth on the south end and the practical reality of 10‑to‑11‑minute drives to the farthest homes increasingly supports adding a south station sooner rather than later. Other council members urged caution, saying the council should buy the right problem rather than adopt a solution too quickly; those council members asked for a specific needs assessment, improved data collection (automated response‑time reporting), and short‑term operational fixes that might reduce turnout time before committing to a long‑term capital bond.

Council asked staff to prepare a formal needs assessment and to return to the council with refined forecasts of call volumes tied to projected housing growth, a prioritized list of low‑cost operational improvements (turnout times, dispatch/technology, station layout), and phased staffing options and cost estimates. Several council members requested that staff include comparisons to nearby jurisdictions and options for phased staffing that would avoid partially staffed stations that proved costly in neighboring cities.

No final decision was made at the meeting; staff said they will compile a needs assessment and return with more granular data within a few months to support budget and bond timing decisions.