Citizen Portal
Sign In

Get Full Government Meeting Transcripts, Videos, & Alerts Forever!

Resident: Deer Creek road project delayed, unsafe; city says paving finished, striping scheduled

6422664 · September 24, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

A Deer Creek resident criticized slow and allegedly low-quality roadwork and said a pedestrian was struck; public works staff told council paving is complete and striping is scheduled for the week of Oct. 6.

A Deer Creek Boulevard resident told the Cibolo City Council that repeated delays and what she described as poor-quality work on a street-rehabilitation project had created safety hazards, including a recent pedestrian crash and close calls for drivers.

Pamela Harrison, a Deer Creek Boulevard resident, told council that the contractor had worked sporadically after work began in May, that expectations about completion dates shifted several times and that an on-site heavy truck drove “the wrong way” during construction, which she described as a near-collision. "Nobody worked on those roads, as you know, from May to June and part of July," Harrison said, and later: "This is totally unacceptable." (Speaker listed as…

Already have an account? Log in

Subscribe to keep reading

Unlock the rest of this article — and every article on Citizen Portal.

  • Unlimited articles
  • AI-powered breakdowns of topics, speakers, decisions, and budgets
  • Instant alerts when your location has a new meeting
  • Follow topics and more locations
  • 1,000 AI Insights / month, plus AI Chat
30-day money-back on paid plans