Cochise County Flood Control District approves $5.52 million Bella Vista detention basin contract

5905482 · October 7, 2025
AI-Generated Content: All content on this page was generated by AI to highlight key points from the meeting. For complete details and context, we recommend watching the full video. so we can fix them.

Summary

The Cochise County Flood Control District approved a $5,518,855 contract with Rommel Construction Inc. for construction of the grant-funded Bella Vista Detention Basin, with a 5% construction contingency; vote was 3-0.

The Cochise County Flood Control District on Tuesday approved a $5,518,855 contract with Rommel Construction Inc. to build the Bella Vista Detention Basin, plus a 5% construction contingency.

The action, moved by Supervisor Gomez and seconded by Supervisor Crosby, passed by a 3-0 voice vote. District members present were Supervisor Crosby (attending remotely), Supervisor Gomez and Supervisor Antonory.

Staff member Solis described the project as a designed detention basin on Coyote Wash that will slow runoff and release water more slowly back into the wash. "It can not only provide us a detention system and slow the water down as far as flood plain purposes, but it also can help as far as recharge because now that water that's in the detention basin is coming out at a super slow rate," Solis said. He added the slower, trickling outflow is intended to increase infiltration into the sand-bottom channel once flood flows recede.

Gomez moved approval of "contract 26-05ENG-01 with Rommel Construction Inc. for the grant funded construction of the Bella Vista Detention Basin in the amount of $5,518,855 plus a 5% construction contingency." The board then voted "aye" three times and the motion passed 3-0.

The motion record in the meeting references the contract as "26Dash05ENGDash01" in the motion language and later in the record as "2505ENGDash01." The board did not provide further detail in the public portion of the meeting about the grant source, schedule, or contract start date.

The project was described during the flood control meeting as grant-funded; Solis confirmed funding is from a grant but the transcript did not specify the grant program or any conditions tied to grant disbursement.

The district adjourned the flood control portion of the meeting after the vote. The next item on the overall county agenda was the jail district meeting.

Votes at a glance: Rommel Construction Inc. contract for Bella Vista Detention Basin — approved 3-0 (Supervisors Crosby, Gomez, Antonory).