District staff presented updated renderings for the Explore Elementary project, showing raised sidewalks to slow traffic, relocated staff parking and a proposed construction storage area that may require demolition of a district-owned house if budget permits.

Williamston Community Schools staff presented updated design renderings for the Explore Elementary addition and site work and answered board questions about traffic flow, parking and temporary construction staging.

Renderings shared with the board show raised sidewalks at pedestrian crossings intended to slow vehicle speeds and make crossing locations more obvious for students. The design relocates staff parking to the north of the drop-off lane; district staff said the project will not eliminate parking but will change its layout. The board heard that drop-off and dismissal patterns would be consolidated so that different program entrances still funnel to a single morning drop-off and a common dismissal point.

Staff said one district‑owned house near the planned staging area could be demolished and used as on-site storage during construction, but that demolition depends on cost and construction logistics. If budget or timing does not permit demolition, staff said the houses would not interfere with the final layout shown in the renderings; the structures were described as a potential construction entrance and storage area during the buildout rather than a required change to the permanent site.

Board members asked specifically whether walking students would still have a safe pedestrian route; staff pointed to raised, identified sidewalks and crosswalk design changes that remove ambiguous crossing points. The presenter described sample materials and color choices for the new building (zinc gray metal panels and green entry accents) and noted the district is finalizing details such as awning orientation and signage. Staff also reported progress on other bond items including continued softball construction, band instrument bids and an HVAC equipment procurement the board will consider later in the meeting.

No final votes on site plan changes were taken at the presentation; the board asked administration to return with additional architectural perspectives and to continue community notification about construction staging and traffic management.