Zoning board grants signage variances at Marathon site, 22901 Mound
Summary
The board approved multiple signage variances for a Marathon-branded fueling station at 22901 Mound, replacing prior variances and allowing new canopy and pump signage.
Get email alerts on the Commercial Signage topic
No spam. Unsubscribe anytime.
The Warren Zoning Board of Appeals on Oct. 8 approved signage variances for a fuel station at 22901 Mound to permit Marathon branding on the canopy and pumps and to replace prior sign approvals.
Sarah Maheson, representing Basel Construction, said the site is an existing shell being converted to Marathon branding and that the work involves replacing panels on the canopy and pumps rather than altering the canopy structure. Zoning staff clarified that some prior variances existed for the canopy and pump signs and that panel replacements on the freestanding pole sign would be permitted without a variance.
Board members discussed the scope of the package and the desirability of relinquishing outdated variances so future applicants face a cleaner record. They also confirmed that the Marathon logo panels would be illuminated but the entire canopy would not be lit, which the board indicated was preferable.
A motion by Mr. Jersey, supported by Mr. Sesser, asked to grant the requested signage allowances on the canopy and pumps and to replace previous canopy-related variances. The motion carried in roll call: votes recorded yes included Mr. Jersey, Mr. Assessor, Mr. Perry, Mr. Green, Mr. Watts, Mr. Lindsey and Chairman Starovich; Mr. Clift voted no, saying the request exceeded ordinance limits.
The approved package listed specific square-foot allowances on canopy elevations and pump islands (detailed in the application) and the board recorded that the overall request would replace prior canopy-related variances for this property.
The applicant was advised to pursue required permits and to coordinate with city engineering and zoning for any final installation details.